Hello Experts,
I'm having this situation:
I have a DEV, QAS, PRD landscape for SAP ERP. They're not in the same release. DEV is ERP 6.0 and QAS & PRD are ERP 6.0 EHP5. I know its weird. I want to go through EHP6 so as I'm not having DEV in the same release I first plan to do some EHP6 test in a sandbox (PRD copy) and the go through EHP6 in QAS, then I want to make a system Copy of QAS (with EHP6) with R3load method and replace the DEV system. Is there a problem with replacing a development system? I know that some things will be lose, like customer program versions, anything else? Any recomendation before trying this strategy?
DB: Oracle 11G.
Thanks for your time. regards,
JAM